Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Climate :
Arid/desert (Köppen B-type) or
alpine
& Land Use:
agricultural- cropland and pasture
& Stakeholder Type :
Industry/Corporate Interest or
Non-legislative governmental agency
& Key Question :
What mechanisms beyond simple allocation can be incorporated into transboundary water agreements to add value and facilitate resolution? or
Where does the benefit “flow” from a hydropower project and how does that affect implementation and sustainability of the project? or
Other
Click on one or more items below to narrow your results.
- Agriculture or Irrigation (17)
- Domestic/Urban Supply (17)
- Fisheries - farmed (1)
- Fisheries - wild (1)
- Hydropower Generation (8)
- Industry - consumptive use (5)
- Industry - non-consumptive use (1)
- Livestock (2)
- Mining/Extraction support (1)
- Other Ecological Services (6)
- Recreation or Tourism (3)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
A
- A Salty Affair: An Analysis of U.S. – Mexico Water Diplomacy in the Colorado River
- Addressing Declining Groundwater Supply in Umatilla County, Oregon, USA
- Addressing the Transboundary Water Conflict Between the Blue Nile Riparian States
C
E
F
I
- Integrated Management and Negotiations for Equitable Allocation of Flow of the Jordan River Among Riparian States
- Integration of a Basin-Wide Framework for Protecting Danube Water Quality
- International Management for Water Quality Within The Kura-Araks Basin
M
N
R
- Regular Complexities: Lebanon's Water Issues
- River Basin Management and Environment Protection through a Conservation Trust Fund in Quito, Ecuador
T
U