Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Climate :
Arid/desert (Köppen B-type) or
Continental (Köppen D-type) or
Dry-winter or
temperate
& Water Use :
Hydropower Generation or
Industry - consumptive use or
Livestock
& Stakeholder Type:
Industry/Corporate Interest
& Key Question :
How can costs for water quality projects be distributed between polluters and beneficiaries? or
How can government be dis/incentivized to offer an inclusive planning process? or
How does asymmetry of power influence water negotiations and how can the negative effects be mitigated? or
Other
Click on one or more items below to narrow your results.
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
A
C
- Case Study of Transboundary Dispute Resolution: the Tigris-Euphrates Basin
- Creative Options and Value Creation to Address Water Security in the Eastern Nile Basin
E
F
I
- Integration of a Basin-Wide Framework for Protecting Danube Water Quality
- International Management for Water Quality Within The Kura-Araks Basin
M
R
T
- The Lesotho Highlands Water Project
- The Upper Colorado River Endangered Fish Recovery and San Juan River Basin Recovery Implementation Programs
W